bot-hermes
|
639306a26f
|
feat: plane-lift schema (states/modules/cycles/links)
Phase 1 of the Plane feature lift into Project E.
Schema changes:
- Add stateGroupEnum, moduleStatusEnum, linkTypeEnum
- Add states table (per-project workflow states with group enum)
- Add modules table (project-scoped planning buckets)
- Add cycles table (time-boxed sprints)
- Add links table (canonical cross-entity mesh)
- Drop taskStatusEnum and tasks.status column
- Add stateId, moduleId, cycleId FKs to tasks
- Drop taskDependencies, noteLinks, noteEntityLinks tables
Project creation bootstrap:
- Seed 5 default states (Backlog/Todo/In Progress/Done/Cancelled) on new project
Minimal API fixes for typecheck:
- Remove references to dropped tables/columns
- Replace status-based queries with completedAt checks
- Stub deprecated dependency/status endpoints for Phase 2
Drizzle migration: 0008_plane-lift-schema.sql (custom, big-bang)
|
2026-09-07 17:02:04 +00:00 |
|
bot-hermes
|
a60b75f075
|
feat: full plan execution - CI/CD, critical fixes, UX polish, secondary/advanced features, E2E + docs
Phase 0 (CI/CD): fix root typecheck to cover api+worker+web; reconcile migration
story into idempotent db:migrate (db:sync + db:triggers); add Gitea Actions
quality/deploy/smoke workflow; rewrite README/AGENTS/DEPLOY docs; add
requireWorkspaceAccess + recordActivityForEntity conventions.
Phase 1 (critical fixes): calendar delete + drag/resize DnD; canvas card CRUD +
bulk save + debounced autosave; logout route; graph edge workspaceId derivation;
real analytics endpoints (drop Math.random); task board droppable columns +
reorder persistence; Tiptap notes editor with sanitized HTML rendering; remove
insecure passkey auth; domain/owner scoping (IDOR) on all by-ID routes + search/
export/realtime scoping; command palette routing + agent mention fetch; agent
activity SSE handler; graph fly-to with tracked positions.
Phase 2 (UX polish): login on design system; Sonner toasts app-wide; shared
Loading/Empty/Error state components; working density/sidebarPos/reduce-motion
settings; Inter typography; consolidated status-colors lib; unified detail
routes; dashboard sort/realtime/responsive fixes; mobile responsive; a11y
(radiogroups, sanitized snippets, badge labels).
Phase 3 (features): daily notes timezone fix + delete + autosave + mood/energy
create; active-domain store + topbar picker; graph domain picker + navigable
entity links; tag assign/remove UI + server-side tag filter; real CSV export +
import validation; custom fields on tasks.
Phase 4 (advanced): migrate job worker into apps/worker (webhook delivery with
HMAC, recurring spawn, ai_dispatch disabled); webhook queue helper + entity
event enqueuing + test endpoint fix; recurring scheduledJobs pipeline; agents
CRUD + permission editing + activity filters; real notifications feed; MCP
polish (validation, error codes, domain scoping, dead sql leftover).
Phase 5 (E2E + docs): rewrite Playwright suite for the Vite SPA (15 specs, new
auth helpers, chromium-only in CI); add ephemeral-Postgres e2e CI job; rewrite
docs/API.md for the real Hono API.
|
2026-08-10 08:53:18 +00:00 |
|