Commit Graph
5 Commits
Author SHA1 Message Date
bot-hermes c6328c120a feat: implement PL-7, PL-8, PL-9 — state-driven board, module/cycle views, link panels + graph edges
PL-7 — Task Board Columns from States:
- Add State, Module, Cycle, Link TypeScript types to types/index.ts
- Add stateId, moduleId, cycleId, trackedMinutes to Task type
- Rewrite tasks.tsx: fetch states from API, render 5 state-group columns
  (backlog/unstarted/started/completed/cancelled), drag-and-drop updates
  stateId via PATCH /tasks/:id, colored state badges, state filter dropdown,
  project filter
- Fix deprecated POST /tasks/:id/status → PATCH /tasks/:id with stateId
- Update tasks/.tsx: state selector dropdown replaces hardcoded status enum,
  toggle complete uses state-based approach, dependencies replaced with
  link-based UI using /api/links

PL-8 — Module + Cycle Views:
- Create apps/api/src/routes/cycles.ts: full CRUD + task assignment/removal
- Create apps/api/src/routes/links.ts: list/create/delete links between entities
- Register cycleRoutes and linkRoutes in API index
- Add Modules tab to project detail: list modules, expand to show tasks,
  add/remove tasks from modules, create/edit/delete module dialogs
- Add Cycles tab to project detail: sprint board grid, backlog lane,
  manual task transfer between cycles and backlog, create/edit cycle dialogs
- Fix ProjectTasks toggle to use PATCH with stateId instead of deprecated endpoint

PL-9 — Link Panels + Graph:
- Update graph API to read links bidirectionally (source OR target)
- Add link type color map (LINK_TYPE_COLORS) for edge rendering
- Graph edges now colored by linkType (blocks=red, relates=gray, etc.)
- Filter panel shows link types with color indicators
- Task detail Dependencies tab now uses /api/links for add/remove links
- Added link type selector (blocks/relates/parent-child/created-from)
2026-09-07 20:24:54 +00:00
bot-hermes 639306a26f feat: plane-lift schema (states/modules/cycles/links)
Phase 1 of the Plane feature lift into Project E.

Schema changes:
- Add stateGroupEnum, moduleStatusEnum, linkTypeEnum
- Add states table (per-project workflow states with group enum)
- Add modules table (project-scoped planning buckets)
- Add cycles table (time-boxed sprints)
- Add links table (canonical cross-entity mesh)
- Drop taskStatusEnum and tasks.status column
- Add stateId, moduleId, cycleId FKs to tasks
- Drop taskDependencies, noteLinks, noteEntityLinks tables

Project creation bootstrap:
- Seed 5 default states (Backlog/Todo/In Progress/Done/Cancelled) on new project

Minimal API fixes for typecheck:
- Remove references to dropped tables/columns
- Replace status-based queries with completedAt checks
- Stub deprecated dependency/status endpoints for Phase 2

Drizzle migration: 0008_plane-lift-schema.sql (custom, big-bang)
2026-09-07 17:02:04 +00:00
bot-hermes 1059512888 feat: add server error logging and tighten workspace isolation 2026-08-10 12:41:46 +00:00
bot-hermes a60b75f075 feat: full plan execution - CI/CD, critical fixes, UX polish, secondary/advanced features, E2E + docs
Phase 0 (CI/CD): fix root typecheck to cover api+worker+web; reconcile migration
story into idempotent db:migrate (db:sync + db:triggers); add Gitea Actions
quality/deploy/smoke workflow; rewrite README/AGENTS/DEPLOY docs; add
requireWorkspaceAccess + recordActivityForEntity conventions.

Phase 1 (critical fixes): calendar delete + drag/resize DnD; canvas card CRUD +
bulk save + debounced autosave; logout route; graph edge workspaceId derivation;
real analytics endpoints (drop Math.random); task board droppable columns +
reorder persistence; Tiptap notes editor with sanitized HTML rendering; remove
insecure passkey auth; domain/owner scoping (IDOR) on all by-ID routes + search/
export/realtime scoping; command palette routing + agent mention fetch; agent
activity SSE handler; graph fly-to with tracked positions.

Phase 2 (UX polish): login on design system; Sonner toasts app-wide; shared
Loading/Empty/Error state components; working density/sidebarPos/reduce-motion
settings; Inter typography; consolidated status-colors lib; unified detail
routes; dashboard sort/realtime/responsive fixes; mobile responsive; a11y
(radiogroups, sanitized snippets, badge labels).

Phase 3 (features): daily notes timezone fix + delete + autosave + mood/energy
create; active-domain store + topbar picker; graph domain picker + navigable
entity links; tag assign/remove UI + server-side tag filter; real CSV export +
import validation; custom fields on tasks.

Phase 4 (advanced): migrate job worker into apps/worker (webhook delivery with
HMAC, recurring spawn, ai_dispatch disabled); webhook queue helper + entity
event enqueuing + test endpoint fix; recurring scheduledJobs pipeline; agents
CRUD + permission editing + activity filters; real notifications feed; MCP
polish (validation, error codes, domain scoping, dead sql leftover).

Phase 5 (E2E + docs): rewrite Playwright suite for the Vite SPA (15 specs, new
auth helpers, chromium-only in CI); add ephemeral-Postgres e2e CI job; rewrite
docs/API.md for the real Hono API.
2026-08-10 08:53:18 +00:00
Hermes 102f51ec1f T4/Phase 2C-3: port graph routes to Hono (4 routes) 2026-08-01 01:47:32 +00:00